Industrial pipework fabrication and installation in Melbourne
Cornerstone supports industrial pipework from shop drawings and spool preparation through to fabrication, site installation and agreed completion checks. We work with Melbourne and Victorian project teams on new installations, modifications and shutdown tie-ins.
Discuss Your Pipework Project →From workshop spools to site connections.
Shop drawings & spooling
Fabrication details and pipe spools developed from agreed design inputs and dimensions.
Pressure pipework
Fabrication and installation to project specifications, with service, pressure and temperature requirements confirmed.
Materials & systems
Carbon steel, stainless steel, PVC and Pressfit systems selected for compatible operating conditions.
Repairs & shutdown tie-ins
Replacement sections, modified connections and plant upgrades planned around access and shutdown windows.
Flange management
Preparation, assembly, inspection and records for flanged connections within the agreed scope.
Mechanical integration
Assembly and installation with pumps, valves, heat exchangers, vessels, supports and associated equipment.
Plan the connections before fabrication.
- Define & detail. Confirm service conditions, materials, drawings and equipment interfaces.
- Plan & fabricate. Agree procedures and inspections, then prepare spools and components.
- Install. Coordinate access, tie-ins, supports and mechanical assembly.
- Check & hand over. Complete agreed inspections, tests and project records.
Our engineering and installation capabilities can connect the complete pipework scope, including material supply and fabrication.

Requirements defined for the service.
Welding processes include GTAW, GMAW and FCAW. Applicable qualifications and project requirements are agreed against AS 3992, AS 4041 and ASME Section IX where relevant.
Confirm materials, joint details, approved procedures and acceptance criteria before fabrication.
Explore Quality Assurance →Tell us what the system needs to do.
Send drawings or photographs, operating conditions, materials, connection details, site location and required dates. Include known shutdown and testing requirements.
Discuss Your Pipework Project →Press-fit pipework systems
Press-fit joints provide an alternative joining system where the pipe material, fluid, pressure, temperature and project specification permit their use. Press-fit connections are not a welding process. Confirm system compatibility and installation requirements before components are selected.
Coordinate pipe welding and mechanical installation around pumps, equipment and service interfaces. Include pipe sizes, operating conditions, connection details and agreed testing requirements in your enquiry.